UC Santa Cruz Telecommunications Infrastructure Upgrade

Client: University of California — Santa Cruz

When: 2013 – 2014

Where: Santa Cruz, CA

Scope of Work: Installation of telecommunications substructure throughout entire UCSC campus. Included installation of ~25 vaults and pullboxes, over 6,000 ft of trenching, and over 6,000 ft of directionally bored 2-4" conduit. Our work also included installing a water line connection for a new building, electrical conduit trenching and new asphalt pavement installation for the campus Emergency Response Center parking lot.