Pebble Beach Undergrounding of Overhead Utilities
Client: Pebble Beach Community Services District
When: June – November 2013
Where: Pebble Beach, CA
Scope of Work: Lewis and Tibbitts was the general contractor for the first phase of the underground trenching of the existing overhead utilities at Pebble Beach. Our work included installation of over 80 vaults and pullboxes, over 11,000 ft of joint trench for electrical, telephone, and cable TV utilities, and extensive asphalt pavement repair and new installation.
Throughout the course of this project, L&T coordinated the job schedule and methods with PG&E, AT&T, Comcast, Pebble Beach Company, Monterey Peninsula Country Club, Concourse d’Elegance, and numerous residents. This was the first phase of a larger endeavor to move all of the overhead utilities underground throughout the entirety of Pebble Beach.